References

OUR PROJECT REFERENCE

Spot Cooling system


We accepted the challege and design the system to cool down the temperature around working staffs in the room.

The room is a baking area with high heat emission from the ovens.

We acheieved the objectives and client is happy


Complete 2nd quarter 2021

IMG_1667
IMG_1668
IMG_1659
IMG_1660
IMG_1662
IMG_1661
IMG_1663
IMG_1665
IMG_1664
IMG_1666

CSI Lucao


Project complete withh full satisfaction 


Client achieves the optimal designed systems with optimal performance and energy saving features.


Complete 1st quarter 2021

IMG-98c0b933748162865596b8af6020e7c6-V
CSI Lucao Chiller
CSI Lucao Freezer-1
CSI Lucao Freezer-1a
Lucao CDUs
CSI Lucao Freezer-2

SMCo Sto Tomas, Batangas


 EKA-KOOL systems make life easy

Completed end of 2020 and performing well


Capilary tube system, saving energy, installation cost, refrigerant cost, running cost and perform optimally.



IMG_1563
IMG_1564
IMG_1565
IMG_1559
IMG_1560
IMG_1561
IMG_1555
IMG_1557
IMG_1558
IMG_1551
IMG_1552
IMG_1553
IMG_1554
IMG_1548
IMG_1549
IMG_1545
IMG_1550

Merry Mart

Happy Client

We deliver the solution customer has asked for and the system running smoothly.

Cooling demands met and  satisfied


Client is happy with the whole process and comitted to total solution by EKA-KOOL


End 2019

KPOI7972
MCEF0643
NJDJ6765
PRFY9462

SM Barotac

 EKA-KOOL Performs every time

Once again we undertake the whole project with consultancy, design and supply. The SM supermaket in Boratac is now in operation and the customer is really happy for the result.


Capilary tube system, saving energy, installation cost, refrigerant cost, running cost and perform optimally.


March 2020

IMG_1242
IMG_1243
IMG_1239
IMG_1240
IMG_1241
IMG_1237
IMG_1238
IMG_1236

Sydney Cake House. Malaysia

"Amazing work, good job!"


We design, manufacturer, supply and oversee refrigeration systems for the whole factory including blast freezer/holding freezer rooms, chiller rooms, +16C production areas, fresh air for production area and free hot water for unitilities

July 2013




Jacobs Creek. Australia

"Great support"


We took on the challenge to make sure the wine storage will be kept at the required temperature, +20C

August 2013




Sharikat International. Singapore

"I would highly recommend"


A 2 levels freezers running with R507. The biggest commercial cold storages of its kind.

Feb. 2016




Hanoi International Airport Holding Refrigerated Rooms.

Vietnam


"Simply Amazing"


Hanoi International Airport terminal 2 holding freezer and chiller

September 2017

Red Ribbon Factory. PHILIPPINES.


"Fast freezing batch"


We designed and supply blast freezer, freezer and chiller rooms

July 2018

Deca Mall

Manila. Philippines


We desiged and supplied the whole refrigeration system with our capilary tube design concept.


Easy installation, less refrigerant charged, higher suction pressure and lower discharge pressure

August 2019

Dole Pineapple

Mindanao


Water Chilled system. We designed and supplied the system to the full satisfaction of the client.

Fantastic job done

Oct. 2019

IMG_0455
IMG_0533
IMG_0529
IMG_0526
IMG_0523
IMG_0513
IMG_0510
IMG_0508
IMG_0497
IMG_0495
IMG_0462
IMG_0459
SCH Hot Water System
rack1
ceiling1
ceiling 8
ceiling 7
ceiling 6
ceiling 5
ceiling 4
ceiling 3
ceiling 2
Sharikat 6
Sharikat 5
Sharikat 4
Sharikat 3
Sharikat 2
Sharikat 1
HNairport1
HN Airport2
HN Airport 3
Sharikat 11
Red Ribbon 4
Red Ribbon 5
Red Ribbon2
SAM_0763
GYRF4092
CDU Pic2
Deca Mall Building
Freezer 20 Glass Doors1
Freezer 20 Glass Doors
Chiller 16 Glass Doors
CDU Pic3
IMG_1051
IMG_1053
IMG_1052
IMG_1050
IMG_1049
IMG_1048

WE CAN ALSO WORK WITH YOU